logo
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation.
banner
About      Faq       Contact     Shop

Awbrey Butte Xeriscape

Project Overview

Description: Landscaping Renovation
Cost: $28k
Time to Build: 1.5 Weeks
Neighborhood: Awbrey Butte
Date: 2014

Project Details

The clients are retired and no longer wanted to spend their time maintaining a lawn. Additionally, they were concerned with water conservation.

 

  • Removed and Replaced Lawn: with native Shevlin Blue Boulders to retain soil where grass once was.
  • Planted:We then placed low maintenance perennials and drought-tolerant grasses for a very low maintenance and low water using garden.
  • Removed Sprinkler System and installed a top-of-the-line drip irrigation system.
  • Installed a low voltage LED outdoor lighting system by FX Luminaire.

Project Photos

Interested in doing some thing similar?

Get My Complimentary Consultation >>>